PRP Fire Station District and Headquarters

DAVID Construction project’s primary objective for the design and construction of the Pleasure Ridge Park Fire Protection Facility was the creation of a highly functional building that met the operational and administrative requirements for the PRP Fire District. The project …

Jeffersonville High School Renovations & Additions

DAVID Construction completed a renovation of 400,000 sq. ft. high school and an addition of approximately 35,000 sq. ft.  DAVID Construction managed the project and was responsible for the bid package. The two general trades packages included site work, demolition, …

Carroll County Library

David Construction, Inc. served as a General Contractor for the renovation and the 12,000 square foot addition to the Carroll County Library. This project completely changed the facade of the library to blend with the historic downtown storefronts in Carrollton, …

Brandenburg Primary School

David Construction constructed a new 106,768 sq. ft. Board of Education. The project consisted of site, load-bearing insulated concrete form (ICF) exterior wall system, load-bearing CMU interior walls, pre-engineered metal truss roof support system, structural concrete mechanical mezzanine, brick veneer, …

5th Floor Office Renovation, Romano Mazzoli Federal Building

This David Construction project was a renovation of general office space on the 5th floor of the Romano Mazzoli Federal Building.  The scope of the renovation covered approximately 30,000 sq. ft.  Interior demolition to construct tenant improvements included new ceilings, …

YMCA Chestnut Street Branch Renovation

This DAVID Construction project consisted of renovating 17,423 sq. ft. on the first floor of the Family Branch of YMCA at Chestnut Street. Additions included new public restrooms, reception area, laundry room, and copier rooms. Renovations included upgrading the lobby area, …

YMCA Camp Piomingo Pool

David Construction built a zero entry pool themed to match the camp environment. The pool incorporated 3000 sq. ft. and featured a triple loop waterslide flowing 800 gallons per minute of water. Pool/pump house was enhanced with exterior finishes to …

Sam Swope Infinity

This DAVID Construction Project consisted of a renovation/addition of 5000 sq. ft. of service and maintenance area for the Sam Swope Infinity dealership.  Swope Infinity continued to operate throughout the construction period at full capacity. Click here for the full …

Fasig-Tipton Yearling Sales Pavilion

DAVID Construction was responsible for a complete overhaul of the following: stairways with specially-designed chandeliers, new flooring, wall covering throughout, and an upscale refinish of the lounge area on the second floor. The entire interior of the sales arena was …

Fasig-Tipton Office Building

David’s Construction Project consisted of the construction of an ambitious new office facility for the venerable thoroughbred sales center in Lexington, KY. The stunning design by Idea Source fit beautifully into the Bluegrass Region outside of Lexington and was intended …